menu

Our businesses:

{{displayStock}}

MacGregor Trade Press Release

MacGregor to supply deck handling solutions for one of world’s largest wind turbine installation vessels

08/09/2022

CARGOTEC CORPORATION, TRADE PRESS RELEASE, 8 SEPTEMBER 2022 AT 11 EEST

MacGregor, part of Cargotec, has been chosen to supply two auxiliary offshore telescopic cranes for Van Oord’s new generation wind turbine installation vessel. The new vessel will mainly operate to support European wind farms.

The contract was booked into Cargotec’s second quarter 2022 orders received. The delivery is scheduled for the third quarter of 2023.

A mega ship and new generation wind turbine vessel
The vessel is being built by Yantai CIMC Raffles Offshore Ltd, and is a new generation of wind turbine installation vessel (WTIV). The 175-meter offshore installation vessel will be purpose-built for the transport and installation of foundations and turbines at offshore wind farms. The main crane lifting capacity is more than 3,000 tonnes. The vessel has an advanced jacking system. Four giant legs, each measuring 126 meters in length, allow the vessel to be jacked up and work in waters up to 70 meters deep. It is considered to be one of largest WTIV vessels in the world in terms of overall dimensions, jacking capacity and lifting capabilities.

Advanced deck handling solutions for the offshore wind environment
MacGregor’s scope of supply encompasses two auxiliary offshore telescopic cranes, which are used to support the cargo and load handling during the installation of wind turbines in the offshore environment, and are equipped with an anti-collision system. The systems and equipment have a long track record of reliability. All products are proven extensively in stringent offshore environments.

“MacGregor is our preferred choice of offshore crane supplier based on our strong relationship and positive collaboration experiences on the previous projects,” says Mr. Sun Shiyan, Director of Supply Chain Management Center, Yantai CIMC Raffles Shipyard. “These offshore telescopic cranes are customized according to the ship owner’s requirements, with high lifting performance and long outreach but very compact and robust design to meet the stringent offshore requirements. We are confident that MacGregor will take special care to ensure the highest standards in quality control and the on-time delivery to our project.”

"MacGregor is delighted to have been selected to supply deck handling solutions to Van Oord’s WTIV. Our involvement at an early stage in this project, combined with our extensive experience in turnkey supply, enables us to provide reliable and efficient solutions, even in the most demanding projects,” says Jan Erik Pedersen, Senior Vice President, Offshore Solutions Division, MacGregor.


For further information, please contact:

Jan Erik Pedersen, Senior Vice President, Offshore Solutions Division, MacGregor
Tel: +47 91 87 74 77, Email: jan.pedersen@macgregor.com

Karolina Hogga, Communications Manager, MacGregor
Tel: +47 95 20 70 12, Email: karolina.hogga@macgregor.com

MacGregor is a leader in sustainable maritime cargo and load handling with a strong portfolio of products, services and solutions, all designed to perform with the sea.
Shipbuilders, shipowners and operators are able to optimise the lifetime profitability, safety, reliability and environmental sustainability of their operations by working in close cooperation with MacGregor. www.macgregor.com

MacGregor is part of Cargotec. Cargotec's (Nasdaq Helsinki: CGCBV) sales in 2021 totalled approximately EUR 3.3 billion and it employs around 11,500 people worldwide. www.cargotec.com

Attachment:

What do you think of the site?